Energy Capital Podcast

Energy Capital Podcast

Josh Rhodes & Matt Boms 109 Episodes Jul 22, 2026

The Texas power grid is being rebuilt in real time. Energy Capital covers the policy fights, market mechanics, and technical decisions shaping what comes next. Hosted by Josh Rhodes (UT Austin) and Matt Boms (TAEBA), with the policymakers, regulators, and researchers at the center of it. Produced by ClarityForge Studios. Topics include ERCOT market operations, grid reliability, renewable integration, distributed energy resources, interconnection and transmission planning, regulatory economics, energy storage, demand response, and the Texas electricity market.

Episodes

Wind is keeping West Texas ranches solvent
Wind is keeping West Texas ranches solvent Jul 22, 2026 2718 Cattle prices swing, goat prices swing, and the drought comes whether or not the ranch can afford it. For a fifth-generation West Texas operation, the search for income that holds steady through all of it comes from an unexpected source: the wind.A wind lease pays the same in a dry year as a wet one, creating a floor under an operation otherwise exposed to weather and commodity prices. When neighb
Why some large loads insist on paying their way
Why some large loads insist on paying their way Jul 15, 2026 2416 Some of the largest electricity buyers in the world have a message for Texas: charge us. The Texas Energy Buyers Alliance was the first organization to propose that large loads pay transmission charges tied to their approved capacity. The idea is to protect other customers as the grid builds out.The scale explains why. ERCOT estimates up to 110 gigawatts of new large loads could seek to connect ov
Texas competes on everything except transmission
Texas competes on everything except transmission Jul 8, 2026 3023 Texas built a competitive retail electricity market: consumers choose among roughly a hundred providers, and generators build power plants at their own risk with no guaranteed return. Transmission, the high-voltage lines that move power from where it is made to where it is used, runs on a different model. One utility builds each line and recovers every cost from ratepayers, plus a return, on time
What batch zero settles and what it leaves open
What batch zero settles and what it leaves open Jul 1, 2026 2958 Batch zero stops being theoretical on July 11. That is the day ERCOT’s rule for connecting large new customers takes effect. The new policy replaces a process that involved studying each giant load independently, then ordering restudies when new giant loads joined the queue, leaving projects stuck in a serial loop. Two prior episodes of this show traced how the new rule was designed. This one asks
Why PJM is looking at the Texas grid
Why PJM is looking at the Texas grid Jun 24, 2026 2267 ERCOT made a choice years ago that most of the country is now reconsidering. Texas runs an energy-only market with no capacity payments, connects generation through connect-and-manage, sorts out delivery in dispatch, and pushes interconnection risk onto developers. That design is a big part of why Texas has added generation faster than any other U.S. grid.PJM, the operator for much of the eastern
Inside the PUC's Cost-Allocation Overhaul with PUC Chairman Gleeson
Inside the PUC's Cost-Allocation Overhaul with PUC Chairman Gleeson Jun 10, 2026 2597 Texas spent five years rebuilding its electrical grid based on the lessons of Winter Storm Uri. Now regulators face a harder question: who pays for the surge of large new customers trying to connect?The projections for electricity demand run far above what will actually get built, and hyperscalers want to power their data centers within 18 months, a pace much faster than the three-to-five years la
How will data centers pay for power?
How will data centers pay for power? Jun 3, 2026 2669 Right now, connecting a data center to the grid works like Texas hog season: no defined season, no bag limits, first-come-first-served, file as many interconnection requests as you want. Travis Kavulla’s recent essay in American Affairs argues the power industry needs something closer to deer season, with defined rounds, allocation rules, and prices that reflect what grid access actually costs.The
How Texas decides which data centers to connect
How Texas decides which data centers to connect May 27, 2026 2970 ERCOT now has roughly 445 gigawatts of large loads asking to connect to the Texas grid, a figure so large that Joshua Rhodes says it might as well be infinite, because the system cannot physically build for all of it.To sort real projects from speculative ones, ERCOT is launching a new screening process called batch zero, and stakeholders voted to advance it at last week’s Technical Advisory Commi
How Texas plans to serve ‘infinite demand’
How Texas plans to serve ‘infinite demand’ May 20, 2026 2583 Texas has spent decades building transmission to serve load growth. The pattern worked when growth rose steadily with new homes, oil and gas operations, and the gradual expansion of the state’s industrial base. It is being tested by a different kind of customer: data centers requesting interconnection at a scale that exceeds what the grid can physically deliver.Eric Goff, founder of Goff Policy an
Austin Energy Enters the Next Phase of Decarbonization
Austin Energy Enters the Next Phase of Decarbonization May 13, 2026 2488 Austin Energy’s power generation hit the 65 percent carbon-free level in 2024, and the municipal utility is targeting 100 percent carbon-free load by 2035, one of the most aggressive clean energy targets of any utility in Texas.Austin Energy is one of the largest municipally owned utilities in the country and one of the few vertically integrated utilities operating inside ERCOT’s deregulated marke
Process is Killing Texas Data Center Projects
Process is Killing Texas Data Center Projects May 6, 2026 2521 As the data center buildout in Texas accelerates, the public conversation has fixated on generation, interconnection queues, and gigawatts. But the firms actually structuring these deals see a different problem entirely: process.In this episode, Joshua Rhodes speaks with Maura Yates, chief executive of Mothership Energy. Mothership is one of the most active retail electricity providers in ERCOT’s
Texas Bets on Speed, with Gin Kinney
Texas Bets on Speed, with Gin Kinney Apr 29, 2026 2898 Texas generators and grid operators used to spend a decade or two planning for new power plants.But as Gin Kinney, chief administrative officer at NRG Energy, told Energy Capital Podcast hosts Matt Boms and Josh Rhodes at CERAweek in Houston this year, the company’s planning horizon has collapsed to 12-18 months.The company’s activity reflects the dynamic growth of the ERCOT grid. Kinney said NRG