The Kenexis Functional Safety Podcast is hosted by Ed Marszal, President and CEO of Kenexis, a technical safety consultancy for the chemical process industry. It explores the IEC 61511 standard by examining the significance of each word and providing detailed interpretation and application guidance. Marszal draws on decades of experience in safety instrumented systems and his work on the ISA 84 committee since 1994. The inaugural season combines technical insight with personal stories from his career and committee discussions.

Episodes

S1E56 Clause 13.2.4 to 13.2.7
S1E56 Clause 13.2.4 to 13.2.7 Sep 9, 2026 00:37:59 During the Factory Acceptance Testing (FAT), you're going to find issues.  You can’t fix them on the spot— you need to trace each one back to wherever it originated in the safety lifecycle and correct everything downstream from that point.
S1E55 Clause 13
S1E55 Clause 13 Aug 25, 2026 00:57:29 Factory Acceptance Testing is where Ed Marszal picks up in Clause 13, starting with an admission: the clause title may be wrong, since 13.2 is called Recommendations when every other point-two clause in the standard states requirements. Scope matters here FAT applies to the SIS logic solver, the engineered, customized subsystem, not off-the-shelf field devices like a pressure transmitter. Ed works
S1E54 12.5 and 12.6
S1E54 12.5 and 12.6 Aug 11, 2026 00:51:30 Clause 12.5 closes out the software section with the meat of application program testing: verification planning tied back to Clause 7, an independent competent-person review, and nine bullet points covering conformance testing, exercising all parts of the program, representative data ranges, negative testing, timing and sequence checks, communication overload stress tests, and integration with the
S1E53 12.4.3 and 12.4.4
S1E53 12.4.3 and 12.4.4 Aug 4, 2026 00:33:55 The best and safest way to write software is to break things down into tested reusable modules...
S1E52 12.4
S1E52 12.4 Jun 16, 2026 00:44:30 At the risk of saving you from hours of unnecessary work, in our latest episode, we tackle a surprisingly common habit: trying to do application program design and implementation at the exact same time. Tune in to hear why this happens, why it's a problem, and how to stop doing it!Grab your headphones and let's streamline your workflow!
S1E51 12.3.4 pt2 to 12.3.5
S1E51 12.3.4 pt2 to 12.3.5 Jun 1, 2026 00:42:45 Designing software comes before writing it. We're still inthe design phase and will be for a bit…Listen in to this episode as the discussion of this topic continues.
S1E50 12.3
S1E50 12.3 May 18, 2026 00:53:35 To clarify, the standard separates application program design from its actual implementation.  It feels like a bit much…Join us for our 50th episode as this is discussed in more detail!
S1E49 12.2.6 to 12.2.9
S1E49 12.2.6 to 12.2.9 May 4, 2026 00:51:10 The startup sequence of a Safety Instrumented System (SIS)represents a critical vulnerability phase, as it triggers initialization code that rarely executes during steady-state operation.Join us as this important topic is discussed in this episode.
S1E48 12.1 to 12.2.5
S1E48 12.1 to 12.2.5 Mar 30, 2026 00:47:17 The first technical safety standard ISA84 didn’t talk about programming in it at all.  So, we decided when we added it, wewould wildly over complicate the situation…
S1E47 11.9.3 to 11.9.5
S1E47 11.9.3 to 11.9.5 Mar 25, 2026 00:52:08 Do not incorporate human failure into your SIL verification calculations, it will actually lead you to do the wrongthing.In this episode, this important topic is covered by our industry expert as he discusses these sections and shares his vast knowledge and experience.
S1E46 11.9.1 and 11.9.2
S1E46 11.9.1 and 11.9.2 Mar 17, 2026 01:02:36 When it comes to SIL verification calculations, we look at Clause 11.9. It’s appropriately titled 'Quantification of Random Failures'…putting the focus on 'random' right there in the name.
S1E45 11.8.4 to 11.8.6
S1E45 11.8.4 to 11.8.6 Jan 20, 2026 00:36:32 A device should never remain in bypass indefinitely. Bypass duration must be time-limited, and appropriate compensating measures must be implemented. Listen in for more information and thoughts on this important topic.